Planting Machine should inject oil into each oil filling point in time before working to ensure that the running parts are fully lubricated.

(1)

Planting Machine should inject oil into each oil filling point in time before working to ensure that the running parts are fully lubricated. The missing or damaged parts should be supplemented, replaced and repaired in time. Be careful not to apply oil to the gears and chains to avoid sticking to the mud and increasing wear.
(2) The working length of each metering wheel is equal, and the displacement is the same. The seeding rate adjustment mechanism is flexible, and there must be no sliding and empty movement.
(3) Disc opener The disc rotates flexibly, must not shake, and does not rub against the opener body.
(4) Before and after each shift and during work, the soil in all parts should be cleaned up, paying special attention to removing the soil and oil on the transmission system.
(5) After the end of each shift, the fertilizer in the fertilizer box should be cleaned to prevent the fertilizer from corroding the fertilizer box and the fertilizing part. Check whether the seed metering shaft and the fertilizer shaft rotate flexibly.
(6) After each shift, the planter should be parked in a dry covered shed. When parking in the open air, cover the seed fertilizer box tightly. When parking, drop the opener, put down the support to support the machine body, and reduce unnecessary load on the frame of the Vegetable Planter.