Rock Button Bits Structure

Comments · 214 Views

Operators should accept the training and guidance of the manufacturer, have a full understanding of the structure and performance of Rock Button Bits, and obtain certain operation and maintenance experience before operating the machine.

  1. Operators should accept the training and guidance of the manufacturer, have a full understanding of the structure and performance of Rock Button Bits, and obtain certain operation and maintenance experience before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the operation and maintenance manual, and perform operation and maintenance according to the requirements of the manual.
    2. Pay attention to the working load during the running-in period. Generally, the working load during the running-in period should not exceed 80% of the rated working load, and a suitable workload should be arranged to prevent the overheating caused by the continuous operation of the machine for a long time.
     3. Pay attention to frequently observe the instructions of each instrument. If there is an abnormality, stop and remove it in time. If the cause is not found and the fault is not removed, the operation should be stopped.
     4. Pay attention to frequently check the lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) level and quality, and pay attention to check the seal of the whole machine. It is found that there is too much oil and water during the inspection, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requirements).
     5. Before the machine works, it is necessary to fill the lifter with lubricating butter, because the dirty water containing sediment is easy to enter, which will wear the bearing and reduce the sensitivity of the lifter of the drilling rig. It is necessary to keep the machine clean, adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the parts to be lost.
     6. At the end of the running-in period, the machine should be maintained compulsorily, inspection and adjustment should be done, and attention should be paid to the replacement of oil. In addition, check the oil quantity and quality of the oil tank before work, and check whether the oil quantity of each reducer gear is sufficient and whether the oil quality is normal.
     7. Check the steel structure for cracks, corrosion, desoldering and other damages. Check whether the main and auxiliary steel wire ropes have broken wires and whether their connections are intact and safe.
     
    8. Inspection and replacement of thrust bearing grease for manual Water Well Drilling Tools accessories flat valve
      The thrust bearing of the flat valve of the water well drilling rig parts adopts lithium-based grease. The consumption of the grease should be checked after each maintenance. If deterioration, contamination or lack is found, it should be replaced or supplemented immediately. The valve cavity should be timely performed during each maintenance. Flush and refill the sealing grease to lubricate the valve plate and valve seat.
     During the maintenance process, if a slight leakage occurs at the valve stem sealing packing seal, the sealing grease can be injected through the sealing grease injection valve on the valve cover to prevent leakage, but the seal should be replaced in time after the construction is completed. Before refilling the valve with sealing grease, the internal pressure of the valve body must be considered. The pressure of the high-pressure injection gun used must be greater than the internal pressure of the valve in order to successfully inject the sealing grease. Put 7903 sealing grease in the injection gun and connect it to the injection valve on the valve cover through a hose. Operate the injection gun and inject the sealing grease.
    In short, the maintenance requirements for water well drilling rigs during the running-in period can be summarized as: load reduction, attention to inspection, and enhanced lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve operating efficiency, and bring you more economic benefits.